Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Enhancement
Total Cost: $2,043,118
Total Funding: $2,737,642
System: Interstate
Total Cost: $136,769,171
Total Funding: $12,932,900
System: Interstate
Total Cost: $41,282,552
Total Funding: $23,978,194
System: Interstate
Total Cost: $124,597,325
Total Funding: $7,832,371
System: Interstate
Total Cost: $6,635,307
Total Funding: $5,907,653
System: Interstate
Total Cost: $125,500,000
Total Funding: $10,000,000
System: Interstate
Total Cost: $32,500,000
Total Funding: $32,500,000
I-264 Downtown Tunnel PPTADowntown Tunnel, Route 264
System: Interstate
Scope: R/W or Eng
Total Cost: $1,960,416
Total Funding: $1,960,416
System: Interstate
Total Cost: $15,049,410
Total Funding: $14,476,260
System: Interstate
Total Cost: $202,974
Total Funding: $202,974
System: Interstate
Total Cost: $122,551,685
Total Funding: $144,000,000
System: Interstate
Total Cost: $5,245,371
Total Funding: $695,371
System: Interstate
Total Cost: $570,488
Total Funding: $620,448
System: Interstate
Total Cost: $1,114,745
Total Funding: $1,114,745
System: Interstate
Total Cost: $8,000,000
Total Funding: $8,000,000
System: Interstate
Total Cost: $189,707,675
Total Funding: $213,592,853
System: Interstate
Total Cost: $166,376,067
Total Funding: $123,765,958