Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
George Washington Highway WideningGeorge Washington Highway (17), Route 17
System: Urban
Total Cost: $47,822,292
Total Funding: $47,822,292
System: Urban
Total Cost: $237,313
Total Funding: $237,313
System: Urban
Total Cost: $204,000
Total Funding: $204,000
System: Urban
Total Cost: $2,400,000
Total Funding: $2,400,000
System: Urban
Total Cost: $173,671
Total Funding: $173,671
System: Urban
Total Cost: $117,057
Total Funding: $117,057
System: Urban
Total Cost: $150,000
Total Funding: $150,000
System: Urban
Total Cost: $2,836,383
Total Funding: $2,836,382
System: Urban
Scope: Safety
Total Cost: $1,330,838
Total Funding: $1,210,000
System: Urban
Total Cost: $2,163,325
Total Funding: $2,163,325
System: Urban
Total Cost: $5,018,859
Total Funding: $5,018,859