Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: $3,004,569,251
Total Funding: $2,847,040,301
System: Primary
Total Cost: $1,530,199,250
Total Funding: $1,452,199,250
System: Primary
Total Cost: $924,790,724
Total Funding: $924,790,724
System: Primary
Total Cost: $579,256,089
Total Funding: $431,996,543
System: Primary
Total Cost: $486,597,590
Total Funding: $564,914,396
System: Interstate
Total Cost: $231,791,591
Total Funding: $22,254,439
System: Interstate
Total Cost: $175,832,897
Total Funding: $175,832,897
System: Interstate
Total Cost: $164,442,004
Total Funding: $156,654,734
System: Primary
Total Cost: $155,924,903
Total Funding: $117,648,785
System: Interstate
Total Cost: $152,094,716
Total Funding: $152,094,716
System: Interstate
Scope: Other
Total Cost: $140,000,000
Total Funding: $140,000,000
System: Interstate
Scope: Other
Total Cost: $140,000,000
Total Funding: $72,189,388
System: Interstate
Total Cost: $137,421,369
Total Funding: $10,000,000
Home » TIP Projects