Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Primary
Total Cost: $924,790,724
Total Funding: $798,071,926
System: Interstate
Total Cost: $600,000,000
Total Funding: $599,833,296
System: Primary
Total Cost: $486,597,590
Total Funding: $564,597,590
System: Primary
Total Cost: $344,523,702
Total Funding: $344,942,837
System: Primary
Total Cost: $579,256,081
Total Funding: $319,159,225
System: Interstate
Total Cost: $189,707,675
Total Funding: $213,592,853
System: Urban
Total Cost: $181,527,945
Total Funding: $181,533,677
System: Interstate
Total Cost: $152,094,716
Total Funding: $152,094,716
System: Interstate
Total Cost: $122,551,685
Total Funding: $144,000,000
System: Interstate
Total Cost: $166,376,067
Total Funding: $123,765,958
Hampton Boulevard ReconstructionHampton Boulevard, Route 337
System: Urban
Total Cost: $104,318,752
Total Funding: $104,318,752
System: Primary
Total Cost: $98,400,461
Total Funding: $98,400,461
System: Primary
Scope: Other
Total Cost: $155,924,903
Total Funding: $90,408,833
Holland Road WideningHolland Road , Route 58
System: Urban
Total Cost: $77,183,424
Total Funding: $77,183,424
System: Urban
Total Cost: $68,352,850
Total Funding: $68,382,794
Midtown Tunnel PPTAMidtown Tunnel, Route 58
System: Primary
Scope: R/W or Eng
Total Cost: $65,086,784
Total Funding: $65,086,784
Military Highway WideningMilitary Highway , Route 13
System: Urban
Total Cost: $60,476,095
Total Funding: $60,476,095
Witchduck Road WideningWitchduck Road, Route 190
System: Urban
Total Cost: $60,381,446
Total Funding: $60,381,446
System: Interstate
Total Cost: $54,592,576
Total Funding: $54,592,576
Home » TIP Projects