Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $17,114,385
Total Funding: $13,918,671
System: Urban
Total Cost: $88,226,263
Total Funding: $88,339,263
Deep Creek Bridge ReplacementGeorge Washington Highway, Route 17
System: Primary
Total Cost: $62,267,013
Total Funding: $62,100,956
System: Interstate
Total Cost: $67,616,743
Total Funding: $10,000,000
System: Interstate
Total Cost: $36,960,347
Total Funding: $43,040,542
System: Interstate
Total Cost: $164,441,946
Total Funding: $156,655,883
System: Primary
Total Cost: $924,790,724
Total Funding: $924,790,724
System: Primary
Total Cost: $4,800,000
Total Funding: $4,800,000
System: Primary
Total Cost: $40,641,836
Total Funding: $46,408,028
System: Urban
Total Cost: $67,619,241
Total Funding: $68,382,794
System: Urban
Total Cost: $27,478,741
Total Funding: $27,478,741
System: Urban
Total Cost: $27,273,632
Total Funding: $27,273,632
System: Urban
Total Cost: $24,834,137
Total Funding: $24,834,137
System: Urban
Total Cost: $51,283,300
Total Funding: $49,324,959
System: Urban
Total Cost: $45,552,800
Total Funding: $10,500,000
System: Secondary
Total Cost: $16,302,392
Total Funding: $16,302,392
Home » TIP Projects