Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $86,060,641
Total Funding: $86,060,641
System: Urban
Total Cost: $17,114,385
Total Funding: $15,397,477
System: Enhancement
Total Cost: $1,918,119
Total Funding: $1,918,119
Deep Creek Bridge ReplacementGeorge Washington Highway, Route 17
System: Primary
Total Cost: $61,427,000
Total Funding: $48,468,000
System: Urban
Total Cost: $68,121,203
Total Funding: $68,383,567
System: Urban
Total Cost: $57,209,600
Total Funding: $55,983,300
System: Interstate
Total Cost: $36,960,347
Total Funding: $43,040,542
System: Interstate
Total Cost: $137,421,369
Total Funding: $10,000,000
System: Primary
Total Cost: $50,503,700
Total Funding: $46,112,978
System: Secondary
Total Cost: $4,071,513
Total Funding: $3,953,245
System: Interstate
Total Cost: $164,442,004
Total Funding: $156,654,734
System: Urban
Total Cost: $15,250,000
Total Funding: $15,250,000
System: Urban
Total Cost: $4,725,968
Total Funding: $4,725,969
System: Secondary
Total Cost: $21,866,929
Total Funding: $15,221,392
System: Urban
Total Cost: $27,479,450
Total Funding: $27,478,741
System: Urban
Total Cost: $27,865,300
Total Funding: $27,834,137
System: Urban
Total Cost: $33,430,613
Total Funding: $6,696,210
System: Interstate
Total Cost: $3,004,569,251
Total Funding: $2,847,040,301