Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Scope: Transit
Total Cost:
Total Funding: $179,000
Scope: Transit
Total Cost:
Total Funding: $155,000
Scope: Transit
Total Cost: NA
Total Funding: $400,000
Scope: Transit
Total Cost: NA
Total Funding: $9,063,000.00
Scope: Transit
Total Cost: NA
Total Funding: $542,000.00
Scope: Transit
Total Cost: NA
Total Funding: $375,000.00
Scope: Transit
Total Cost: NA
Total Funding: $7,390,000.00
Scope: Transit
Total Cost: NA
Total Funding: $185,000.00
System: Interstate
Total Cost: $125,500,000
Total Funding: $10,000,000
System: Urban
Total Cost: $68,352,850
Total Funding: $68,382,794
Scope: Transit
Total Cost: NA
Total Funding: $20,000.00
System: Interstate
Total Cost: $4,000,000
Total Funding: $4,000,000
System: Urban
Total Cost: $1,257,000
Total Funding: $1,257,000
System: Urban
Scope: Safety
Total Cost: $1,213,851
Total Funding: $1,213,851
System: Urban
Total Cost: $1,121,994
Total Funding: $1,128,981
System: Urban
Total Cost: $5,320,100
Total Funding: $5,320,100