Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
 
Victoria Boulevard
Scope: Transit
Total Cost: $10,000,000
Total Funding: $3,132,184
System: Interstate
Total Cost: $109,040,000
Total Funding: $6,670,000
System: Interstate
Total Cost: $24,468,539
Total Funding: $4,505,858
System: Urban
Total Cost: $68,121,203
Total Funding: $68,383,567
System: Interstate
Total Cost: $4,000,000
Total Funding: $4,000,000
System: Urban
Total Cost: $1,558,402
Total Funding: $1,494,035
System: Primary
Total Cost: $12,796,731
Total Funding: $12,796,731
System: Urban
Total Cost: $2,332,158
Total Funding: $2,364,217
System: Urban
Total Cost: $5,686,395
Total Funding: $5,686,395
System: Urban
Total Cost: $8,285,168
Total Funding: $8,285,168
System: Enhancement
Scope:
Total Cost: $1,918,119
Total Funding: $1,918,119
System: Primary
Total Cost: $4,800,000
Total Funding: $4,800,000