Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: $47,319,540
Total Funding: $47,319,540
System: Urban
Total Cost: $43,824,000
Total Funding: $47,009,769
System: Urban
Total Cost: $24,834,137
Total Funding: $24,834,137
System: Urban
Total Cost: $27,273,632
Total Funding: $9,581,732
System: Interstate
Scope: Other
Total Cost: $23,398,069
Total Funding: $23,298,069
Scope: Other
Total Cost: $4,543,620
Total Funding: $4,500,000
System: Primary
Total Cost: $30,673,073
Total Funding: $10,200,000
System: Urban
Total Cost: $5,950,000
Total Funding: $5,950,000
George Washington Highway WideningGeorge Washington Highway, Route 17
System: Urban
Total Cost: $36,024,000
Total Funding: $1,000,000
System: Primary
Total Cost: $2,800,995
Total Funding: $2,800,995
System: Urban
Total Cost: $822,000
Total Funding: $822,000
System: Secondary
Total Cost: $2,390,140
Total Funding: $2,390,140
System: Urban
Total Cost: $203,988
Total Funding: $204,000