Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Granby Street Bridge RepairsGranby Street, Route 460
System: Primary
Total Cost: $3,500,000
Total Funding: $3,500,000
System: Secondary
Total Cost: $2,390,000
Total Funding: $452,000
Hampton Boulevard ReconstructionHampton Boulevard, Route 337
System: Urban
Total Cost: $104,318,752
Total Funding: $104,318,752
System: Urban
Total Cost: $203,988
Total Funding: $204,000
System: Interstate
Total Cost: $6,500,000
Total Funding: $11,352,527
System: Urban
Total Cost: $553,000
Total Funding: $553,000
System: Urban
Total Cost: $1,392,000
Total Funding: $1,392,000
System: Urban
Total Cost: $2,362,998
Total Funding: $3,444,000
System: Urban
Total Cost: $68,272,339
Total Funding: $68,272,339
Holland Road WideningHolland Road , Route 58
System: Urban
Total Cost: $77,183,424
Total Funding: $77,183,424
System: Urban
Scope:
Total Cost: $14,396,071
Total Funding: $8,167,464
System: Interstate
Total Cost: $5,245,371
Total Funding: $695,371
System: Interstate
Scope: Other
Total Cost: $30,000,000
Total Funding: $30,000,000
Scope: Transit
Total Cost: $12,855,022
Total Funding: $10,344,545
Scope: Transit
Total Cost:
Total Funding: $4,428,000.00