Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $19,215,146
Total Funding: $19,822,904
Wythe Creek Road WideningWythe Creek Road, Route 172
System: Urban
Total Cost: $23,400,000
Total Funding: $29,768,934
System: Urban
Total Cost: $260,000
Total Funding: $278,000
Witchduck Road WideningWitchduck Road, Route 190
System: Urban
Total Cost: $60,381,446
Total Funding: $60,381,446
System: Urban
Total Cost: $200,000
Total Funding: $200,000
Scope: Transit
Total Cost: $9,000,000
Total Funding: $11,126,800
System: Urban
Total Cost: $3,790,738
Total Funding: $3,785,066
System: Urban
Total Cost: $4,718,400
Total Funding: $4,718,400
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $11,178,154
Total Funding: $12,762,921
Warwick Boulevard RelocationWarwick Boulevard, Route 60
System: Urban
Total Cost: $18,219,124
Total Funding: $1,600,000
System: Urban
Total Cost: $8,245,900
Total Funding: $8,200,000
System: Urban
Total Cost: $2,336,605
Total Funding: $2,336,605
Scope: Other
Total Cost: $25,740,000
Total Funding: $9,000,000
System: Primary
Total Cost: $150,000
Total Funding: $150,000
System: Primary
Total Cost: $5,000,000
Total Funding: $5,000,000
System: Urban
Total Cost: $13,666,142
Total Funding: $13,795,926
Home » TIP Projects