Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $1,650,000
Total Funding: $1,650,000
System: Urban
Total Cost: $2,128,000
Total Funding: $778,000
Scope: Transit
Total Cost: NA
Total Funding: $175,000.00
System: Urban
Total Cost: $195,000
Total Funding: $195,100
System: Primary
Total Cost: $50,503,700
Total Funding: $42,525,487
System: Urban
Total Cost: $24,079,507
Total Funding: $23,814,232
Shoulders Hill Road Multi-Use PathShoulders Hill Road , Route 626
System: Urban
Total Cost: $272,000
Total Funding: $272,000
System: Primary
Total Cost: $98,400,461
Total Funding: $98,400,461
System: Primary
Scope: Safety
Total Cost: $2,100,000
Total Funding: $2,028,866
System: Secondary
Total Cost: $4,686,681
Total Funding: $3,879,209
System: Primary
Total Cost: $62,410,432
Total Funding: $1,769,706
System: Primary
Total Cost: $7,221,469
Total Funding: $1,529,261
System: Primary
Scope: Other
Total Cost: $155,924,903
Total Funding: $90,408,833
System: Primary
Total Cost: $618,777
Total Funding: $618,777
System: Primary
Total Cost: $4,643,259
Total Funding: $793,396
System: Primary
Total Cost: $6,770,000
Total Funding: $6,770,000
Route 17 Widening in Yorktown (PE Only)George Washington Memorial Highway, Route 17
System: Primary
Total Cost: $833,033
Total Funding: $833,033
System: Primary
Total Cost: $6,976,543
Total Funding: $6,976,543
Home » TIP Projects