Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: $41,282,552
Total Funding: $23,978,194
System: Interstate
Total Cost: $124,597,325
Total Funding: $7,832,371
Witchduck Road WideningWitchduck Road, Route 190
System: Urban
Total Cost: $60,381,446
Total Funding: $60,381,446
System: Primary
Total Cost: $344,523,702
Total Funding: $344,942,837
System: Interstate
Total Cost: $6,635,307
Total Funding: $5,907,653
System: Primary
Total Cost: $3,346,122
Total Funding: $2,929,777
System: Interstate
Total Cost: $125,500,000
Total Funding: $10,000,000
Nansemond Parkway WideningNansemond Parkway, Route 337
System: Urban
Total Cost: $9,584,206
Total Funding: $11,060,019
System: Urban
Total Cost: $32,020,000
Total Funding: $32,020,000
System: Urban
Total Cost: $17,078,876
Total Funding: $17,078,876
System: Urban
Total Cost: $4,718,400
Total Funding: $4,718,400
Midtown Tunnel PPTAMidtown Tunnel, Route 58
System: Primary
Scope: R/W or Eng
Total Cost: $63,386,784
Total Funding: $71,649,605
System: Primary
Total Cost: $606,036
Total Funding: $606,036
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $11,178,154
Total Funding: $12,762,921
System: Primary
Total Cost: $11,045,876
Total Funding: $11,045,876
System: Urban
Total Cost: $1,271,217
Total Funding: $1,542,434
System: Urban
Total Cost: $2,719,724
Total Funding: $3,523,200
System: Urban
Total Cost: $868,933
Total Funding: $1,000,000
System: Urban
Total Cost: $6,546,061
Total Funding: $6,546,281