Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Secondary
Total Cost: $19,770,400
Total Funding: $19,770,400
Holland Road WideningHolland Road, Route 58
System: Urban
Total Cost: $77,317,968
Total Funding: $77,317,968
Isle of Wight Multi-Use Trail - Segment 1
 
Battery Park Rd, Route 704
System: Enhancement
Total Cost: $1,562,339
Total Funding: $1,562,340
System: Enhancement
Total Cost: $5,775,843
Total Funding: $5,775,843
System: Primary
Total Cost: $486,597,590
Total Funding: $564,914,396
System: Interstate
Total Cost: $15,049,410
Total Funding: $15,059,530
System: Interstate
Scope: Other
Total Cost: $60,000
Total Funding: $60,000
System: Urban
Total Cost: $200,000
Total Funding: $553,000
System: Urban
Total Cost: $920,000
Total Funding: $920,000
System: Urban
Total Cost: $1,392,000
Total Funding: $1,066,612
System: Secondary
Total Cost: $4,071,513
Total Funding: $3,953,245
System: Primary
Total Cost: $1,492,341
Total Funding: $1,733,866
System: Primary
Total Cost: $54,342,125
Total Funding: $14,855,136
System: Urban
Total Cost: $195,000
Total Funding: $195,100
System: Urban
Total Cost: $500,000
Total Funding: $500,000
System: Urban
Total Cost: $2,332,158
Total Funding: $2,364,217
Shoulders Hill Road Multi-Use PathShoulders Hill Road, Route 626
System: Urban
Total Cost: $788,336
Total Funding: $762,665