Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $26,865,376
Total Funding: $26,865,376
System: Urban
Total Cost: $30,046,326
Total Funding: $1,537,745
System: Urban
Total Cost: $23,113,848
Total Funding: $23,114,752
System: Urban
Scope: Transit
Total Cost: $435,726
Total Funding: $300,000
System: Urban
Total Cost: $3,790,738
Total Funding: $3,785,066
System: Enhancement
Total Cost: $2,043,118
Total Funding: $2,737,642
System: Urban
Total Cost: $1,587,217
Total Funding: $1,587,217
Ocean View Avenue Signal UpgradesOcean View Avenue, Route 60
System: Urban
Total Cost: $557,184
Total Funding: $536,199
System: Interstate
Total Cost: $40,000,000
Total Funding: $32,500,000
System: Urban
Total Cost: $5,320,100
Total Funding: $5,320,100
System: Primary
Total Cost: $7,221,469
Total Funding: $1,529,261
I-264 Downtown Tunnel PPTADowntown Tunnel, Route 264
System: Interstate
Scope: R/W or Eng
Total Cost: $1,960,416
Total Funding: $1,960,416
Wythe Creek Road WideningWythe Creek Road, Route 172
System: Urban
Total Cost: $23,400,000
Total Funding: $29,768,934
System: Primary
Total Cost: $98,400,461
Total Funding: $98,400,461
System: Primary
Total Cost: $2,800,995
Total Funding: $2,800,995
Scope: Transit
Total Cost: $1,017,433
Total Funding: $1,184,030
Home » TIP Projects