Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $1,892,274
Total Funding: $2,579,583
System: Urban
Total Cost: $218,530
Total Funding: $278,000
System: Urban
Total Cost: $77,384,612
Total Funding: $40,435,144
System: Urban
Total Cost: $1,000,000
Total Funding: $1,000,000
System: Urban
Total Cost: $4,936,344
Total Funding: $4,936,344
System: Primary
Total Cost: $579,256,089
Total Funding: $431,996,543
System: Primary
Total Cost: $155,924,903
Total Funding: $117,648,785
Total Cost: $5,042,249
Total Funding: $8,321,002
Scope: Transit
Total Cost: $4,247,000
Total Funding: $4,247,000
System: Interstate
Total Cost: $164,442,004
Total Funding: $156,654,734
System: Interstate
Total Cost: $75,000
Total Funding: $75,000
System: Primary
Total Cost: $6,976,543
Total Funding: $6,976,543
System: Interstate
Total Cost: $570,488
Total Funding: $620,448
System: Primary
Scope: Safety
Total Cost: $385,000
Total Funding: $385,000
Home » TIP Projects