Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $656,600
Total Funding: $657,745
Scope: Transit
Total Cost: $12,855,022
Total Funding: $10,344,545
Scope: Transit
Total Cost: $30,913,307
Total Funding: $22,913,307
Scope: Transit
Total Cost: $370,710
Total Funding: $370,710
Scope: Transit
Total Cost: $17,600,000
Total Funding: $17,600,001
System: Primary
Total Cost: $50,503,700
Total Funding: $42,525,487
System: Urban
Total Cost: $500,000
Total Funding: $0
System: Urban
Total Cost: $2,362,998
Total Funding: $3,444,000
System: Urban
Scope: Safety
Total Cost: $1,213,851
Total Funding: $1,159,821
System: Urban
Total Cost: $1,121,994
Total Funding: $1,128,981
System: Secondary
Total Cost: $12,997,781
Total Funding: $5,427,817
System: Secondary
Total Cost: $22,492,104
Total Funding: $19,800,000
Holland Road WideningHolland Road , Route 58
System: Urban
Total Cost: $77,183,424
Total Funding: $77,183,424
System: Urban
Total Cost: $2,499,649
Total Funding: $6,558,686
Home » TIP Projects