Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: $152,094,716
Total Funding: $152,094,716
System: Urban
Total Cost: $15,250,000
Total Funding: $15,250,000
System: Urban
Total Cost: $4,725,968
Total Funding: $4,725,969
Scope: Transit
Total Cost: $2,000,000
Total Funding: $2,000,000
System: Urban
Total Cost: $1,558,402
Total Funding: $1,494,035
System: Urban
Total Cost: $1,309,883
Total Funding: $1,519,262
System: Urban
Scope: Other
Total Cost: $2,096,839
Total Funding: $2,007,530
System: Urban
Total Cost: $370,000
Total Funding: $726,681
System: Urban
Total Cost: $2,128,000
Total Funding: $2,128,000
System: Enhancement
Total Cost: $1,249,742
Total Funding: $1,488,307
Home » TIP Projects