Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $9,270,000
Total Funding: $9,270,000
System: Secondary
Total Cost: $12,823,800
Total Funding: $10,577,000
System: Urban
Total Cost: $38,046,825
Total Funding: $35,046,825
Deep Creek Bridge ReplacementGeorge Washington Highway, Route 17
System: Primary
Total Cost: $61,427,000
Total Funding: $48,468,000
System: Interstate
Total Cost: $100,692,685
Total Funding: $61,418,126
System: Urban
Total Cost: $150,000
Total Funding: $150,000
System: Primary
Total Cost: $5,322,542
Total Funding: $5,322,542
System: Urban
Scope: Transit
Total Cost: $1,016,377
Total Funding: $1,291,509
System: Urban
Total Cost: $115,000
Total Funding: $115,000
System: Urban
Total Cost: $62,771,154
Total Funding: $28,310,757
System: Urban
Total Cost: $5,067,320
Total Funding: $2,508,050
System: Urban
Total Cost: $53,551,419
Total Funding: $13,503,981
System: Interstate
Scope: Other
Total Cost: $30,000,000
Total Funding: $30,000,000
System: Secondary
Total Cost: $2,777,874
Total Funding: $2,777,874