Administrative Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: $47,319,540
Total Funding: $47,319,540
System: Primary
Total Cost: $1,530,199,250
Total Funding: $1,452,199,250
System: Urban
Total Cost: $9,270,000
Total Funding: $9,270,000
System: Interstate
Total Cost: $152,094,716
Total Funding: $152,094,716
System: Interstate
Total Cost: $75,000
Total Funding: $75,000
System: Interstate
Total Cost: $164,442,004
Total Funding: $156,654,734
Scope: Transit
Total Cost: $4,247,000
Total Funding: $4,247,000
System: Interstate
Scope: Other
Total Cost: $60,000
Total Funding: $60,000
System: Primary
Total Cost: $2,800,995
Total Funding: $2,800,995
System: Urban
Scope: Safety
Total Cost: $2,254,845
Total Funding: $2,254,845
System: Primary
Total Cost: $98,400,461
Total Funding: $98,400,461
Midtown Tunnel PPTAMidtown Tunnel, Route 58
System: Primary
Total Cost: $65,086,784
Total Funding: $68,832,230
System: Interstate
Total Cost: $6,635,307
Total Funding: $6,635,307
System: Primary
Total Cost: $7,550,700
Total Funding: $7,550,700