Administrative Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: $6,500,000
Total Funding: $11,352,527
System: Interstate
Total Cost: $202,974
Total Funding: $202,974
System: Interstate
Total Cost: $15,049,410
Total Funding: $14,476,260
System: Primary
Total Cost: $486,597,590
Total Funding: $564,597,590
System: Urban
Total Cost: $3,841,121
Total Funding: $3,840,947
System: Urban
Total Cost: $656,600
Total Funding: $657,745
System: Urban
Total Cost: $1,587,217
Total Funding: $1,587,217
System: Urban
Total Cost: $30,046,326
Total Funding: $1,537,745
System: Urban
Total Cost: $868,933
Total Funding: $1,000,000
System: Primary
Total Cost: $606,036
Total Funding: $606,036
System: Urban
Total Cost: $4,718,400
Total Funding: $4,718,400
System: Primary
Total Cost: $344,523,702
Total Funding: $344,942,837
System: Interstate
Total Cost: $124,597,325
Total Funding: $7,832,371
Hampton Boulevard ReconstructionHampton Boulevard, Route 337
System: Urban
Total Cost: $104,318,752
Total Funding: $104,318,752
Warwick Boulevard RelocationWarwick Boulevard, Route 60
System: Urban
Total Cost: $18,219,124
Total Funding: $1,600,000
System: Primary
Total Cost: $62,410,432
Total Funding: $3,250,000
System: Urban
Total Cost: $28,935,344
Total Funding: $28,935,344
System: Urban
Total Cost: $181,527,945
Total Funding: $181,533,677
Home » TIP Projects