Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Scope: Transit
Total Cost: $677,389
Total Funding: $785,009
Scope: Transit
Total Cost: NA
Total Funding: $14,000,000
Scope: Transit
Total Cost: NA
Total Funding: $10,000
Scope: Transit
Total Cost: NA
Total Funding: $320,000
System: Urban
Total Cost: $24,834,137
Total Funding: $500,000
Scope: Other
Total Cost: $4,543,620
Total Funding: $4,500,000
System: Interstate
Scope:
Total Cost: $35,467,975
Total Funding: $30,935,080
System: Urban
Total Cost: $29,000,200
Total Funding: $2,862,338
System: Interstate
Total Cost: $4,000,000
Total Funding: $4,000,000
System: Urban
Total Cost: $25,723,440
Total Funding: $15,926,920
System: Interstate
Scope: Other
Total Cost: $25,000,000
Total Funding: $25,000,000
System: Urban
Scope:
Total Cost: $14,396,071
Total Funding: $8,167,464
System: Urban
Scope:
Total Cost: $1,518,536
Total Funding: $1,825,566
System: Urban
Scope:
Total Cost: $7,038,505
Total Funding: $7,638,122
System: Urban
Scope:
Total Cost: $17,479,961
Total Funding: $20,364,160
System: Interstate
Total Cost: $5,000,000
Total Funding: $5,000,000
System: Urban
Total Cost: $115,000
Total Funding: $115,000
Granby Street Bridge RepairsGranby Street, Route 460
System: Primary
Total Cost: $3,500,000
Total Funding: $3,500,000
Home » TIP Projects