Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Primary
Total Cost: $6,770,000
Total Funding: $6,770,000
System: Interstate
Total Cost: $103,210,019
Total Funding: $40,682,537
Deep Creek Bridge ReplacementDominion Boulevard, Route 17
System: Primary
Total Cost: $48,468,000
Total Funding: $20,000,000
System: Urban
Total Cost: $30,095,500
Total Funding: $30,095,500
System: Secondary
Total Cost: $11,658,000
Total Funding: $9,982,458
System: Urban
Total Cost: $2,336,605
Total Funding: $2,336,605
System: Urban
Total Cost: $9,270,000
Total Funding: $2,089,469
System: Urban
Total Cost: $2,128,000
Total Funding: $778,000
System: Urban
Total Cost: $4,573,000
Total Funding: $4,753,000
System: Urban
Total Cost: $15,250,000
Total Funding: $153,082
System: Primary
Total Cost: $1,381,900
Total Funding: $682,155
System: Interstate
Total Cost: $152,094,716
Total Funding: $152,094,716
System: Interstate
Total Cost: $54,592,576
Total Funding: $54,592,576
System: Secondary
Total Cost: $2,990,000
Total Funding: $452,000
System: Urban
Total Cost: $200,000
Total Funding: $200,000