UPC# 111926: I-64 Peninsula - Segment I (child project of UPC 104905)
Jurisdiction: Hampton Roads
Street: I-64Route #: 64
Project Cost: $11,608,385
Funding: $11,608,385
Project Detail Sheet:
File Size: 818 KB
Project Summary:Funding provided by HRTAC to the HRTPO TIP under parent project UPC 104905 to repair existing lanes and add one eastbound and westbound 12 ft. lane and 12 ft. medium shoulder throughout project limits; strengthen/widen east and westbound outside shoulders
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
Home » TIP Projects » Interstate » I-64 Peninsula - Segment I (child project of UPC 104905)